
Construction update
Lots of progress in the last couple of weeks (as you can see when you compare this view). The cork flooring is down, the cabinets are installed, the shower pan is in. Many of the windows are trimmed out, and a lot of the electrical work is done.
We’ve chosen our track lighting, and the template for the countertop was measured out. Lots of stuff left to do, but we can definitely see the light at the end of the tunnel.
Leave a comment